• Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Corporate News
  • Generation
  • Oil & Gas
  • Regulation
  • Renewable
    • Climate
    • Solar
    • Wind
  • Storage
  • Tech
  • T & D
Energy News Desk Logo

Energy News Desk

Energy News and Data

Camarillo City Council Approves Moving Forward with Solar Microgrid Projects

November 5, 2020 by Solar Industry Mag

The Camarillo City Council has unanimously approved moving forward with the design of hybrid microgrids at five city facilities: city hall, corporation yard, the Camarillo Public Library, police station and wastewater treatment plant. 

In February, the city engaged the Clean Coalition, a Santa Barbara-based nonprofit, and TRC Companies to conduct a solar+storage microgrid feasibility study for the five sites. The study, which assessed the feasibility of standalone solar+storage for each of the five sites compared to using only diesel generators, found that the most feasible and economic solution would be hybrid systems that incorporate solar+storage and diesel generation at four of the five sites. Solar+storage only was recommended for the Camarillo Public Library, which does not need to be kept online during an extended power outage but can benefit from solar+storage backup, as available, and utility bill savings.

“The study made it clear that hybrid solar microgrids are not only feasible but also economically viable,” says Greg Ramirez, city manager of Camarillo. “Implementing these cost-effective hybrid solutions represents a big step toward meeting both city and regional sustainability goals.”

The solar+storage systems recommended in the study will keep the sites online during short-duration outages, with diesel generators reserved for use as backup only when needed during extended outages. Additionally, the microgrids will reduce the cumulative carbon footprint of the five sites by approximately 88%.

Over the anticipated 30-year life of the projects, the microgrids are designed to produce utility bill savings through reduced demand and energy charges at all five facilities. Savings will depend on which financing option the city chooses – a city-owned model or a power purchase agreement (PPA) – in which a third party would own and operate the systems.

The Camarillo City Council approved pursuing grant funding for the project, including an opportunity from the Federal Emergency Management Agency (FEMA), which recently announced a nationwide grant of up to $50 million per applicant for projects such as microgrids and generators that mitigate risks from natural disasters.

Camarillo’s Solar+Storage Microgrid Feasibility Study is available here.

Filed Under: Renewable, Solar

Primary Sidebar

Join The Daily Charge

This week's top 5 stories in your inbox. No spam ever.

Trending

  • SunShare Powers On Colorado Community Solar Project
  • Siemens Gamesa Supplies Turbines to Canada’s Rattlesnake Wind Farm
  • eia.gov logo EIA expects higher wholesale U.S. natural gas prices in 2021 and 2022
  • Offshore Wind Market for Jack-Up Interventions on the Rise
  • BSF Names Orbital EPC in Coal Plant Conversion Projects
  • Despite Odds Offshore Wind Has ‘Colossal Six Months’
  • ALLETE Clean Energy’s Diamond Spring Achieves Commercial Operations
  • RESET Launches Advanced Testing Simulator for Wind Turbines
  • Crowdfunded solar puts Red Lake Nation on a path to energy sovereignty
  • Consortium Receives Funding to Research Feasibility of Renewable Hydrogen

Footer

Trending

  • SunShare Powers On Colorado Community Solar Project
  • Siemens Gamesa Supplies Turbines to Canada’s Rattlesnake Wind Farm
  • EIA expects higher wholesale U.S. natural gas prices in 2021 and 2022
  • Offshore Wind Market for Jack-Up Interventions on the Rise
  • BSF Names Orbital EPC in Coal Plant Conversion Projects

Recent

  • Quick Tips To A Sustainable Future
  • Stem Provides Smart Energy Storage Solutions to Today’s Power
  • EIA's AEO2021 shows U.S. energy-related CO2 emissions rising after the mid-2030s
  • Homeowners associations still a barrier for some would-be solar customers
  • Commentary: With open standards, U.S. can build EV charging infrastructure faster

Search

Contact Us

Write For Us

  • Email
  • Facebook
  • Twitter

Copyright © 2023 · EnergyNewsDesk.com